Pools
|
FAQ'sHow competive are your
prices? How competive are your prices? You’ve heard of the old adage; “you get what you pay for”. Nothing is more true in the pool plastering industry. As stated earlier, “you usually only get one chance to do things right.” There is nothing in this industry, or any other, that someone can’t do cheaper, and sell for less money. Our prices are going to be very competitive for the quality that we put into every job. For that reason, we can stand behind our warranty, and you should put your confidence in Schilli Plastering to be assured of a quality experience. How long will it take to remodel my pool? The length of time depends directly with the extent of work being done. Pools that are just being sandblasted/waterblasted and re-plastered can be completed in 5 days ore less depending on weather. If tile or coping are being replaced, you can figure 7 days or less. We do everything possible to minimize down time. Why is Pebble Tec more expensive than plaster? Pebble Tec® uses natural rock which has to be mined and specifically formulated cement, which is more expensive. Installation of Pebble Tec is a process that requires each installer to be trained, certified, and involves ongoing continuous education on the job. In addition, Pebble Tec® has a longer life expectancy and requires less maintenance than a traditional marcite finish. Yes, but painting is a short term solution. It will make the pool look better for now. Eventually the surface will have to be sandblasted to remove the paint, prior to re-plastering.
Generally, this will depend on mother nature. In the spring, the frost needs to be out of the ground and temperatures maintaining above freezing. In the fall, as long as the temps stay above freezing at night everything will be okay. Can I close my pool after it’s been refinished? We recommend generally that the pool be filled and running for at least 2 weeks after completion. This will allow you to balance the water, stabilize the ph, and give the finish time to cure.
Our crews do numerous jobs in a day’s time. Draining a pool, or pre-coating may only take a couple of hours, so your pool may be 2nd or 3rd on the list. If we are not going to show up as planned, we will generally call to let you know.
Yes, they will fill in and be level when completed.
While we try to minimize the impact our crews have on the area surrounding your pool, a remodel pool can be dusty. We recommend pool furniture and potted plants be moved away from the pool area before sandblasting/waterblasting starts. We will cover planted foliage with plastic to protect while the sandblasting/waterblasting and plastering application is occurring. It is also suggested windows be closed during sandblasting/waterblasting operations. We will start the filling process upon the completion of our work. Generally, allow 24 to 48 hours to fill.
Schilli Plastering Co. is the largest pool plastering contractor in the Midwest. Schilli Plastering is the only certified Pebble Tec/Sheen® pool finish applicator in the Midwest. With 3 full time applicator crews, we are equipped to handle any and all size pools. |
|